OOO RN-Yuganskneftegaz uses new five-bladed bits

25.08.2021       

Company «RN-Yuganskneftegaz» (a mining asset of Rosneft) increased the ROP by an average of 5% compared to 2020 due to the modernization of the rock cutting tool. As a result, oilmen reduced the construction time of wells by 24 hours during production drilling and by more than 10 hours when sidetracking.

ROP depends on rock composition, directional drilling tasks, drilling parameters and can vary significantly for different types of wells. For drilling each well, the optimal drilling equipment is selected, which allows to achieve the maximum ROP and shorten the construction cycle. maximum penetration rate of 96.51 m/h, which is 48% higher than the average for the facility. At the Ust-Balykskoye field, thanks to the use of a bicentric bit, a record ROP of 31.22 m/h was achieved, which is 13 m/h higher than the average for the field.

Individual approach to each well, the use of modern equipment designs, selection of optimal drilling parameters allows to reduce the construction cycle and increase drilling volumes. This year, the specialists of RN-Yuganskneftegaz plan to increase the development drilling footage by 1 million meters compared to 2020 (up to 5.8 million meters).

Help:

RN-Yuganskneftegaz LLC – the key asset of NK Rosneft, which accounts for about 30% of the company's total production. The Company is systematically expanding the territory of its activities, conducting geological exploration and development of deposits in 39 licensed areas with a total area of ​​over 21 thousand square kilometers.

<

Ðåéòèíã@@Mail.ru
^